Sign In | Join Free | My fnxradio.com
China Qingzhou Keda Mining Machine co.,Ltd logo
Qingzhou Keda Mining Machine co.,Ltd
Qingzhou Keda Mining Machine co.,Ltd
Verified Supplier

2 Years

Home > Gold Mining Equipment >

Gold Dry Blower Gold Mining Equipment with 1-3t/h Processing Capacity ISO 9001:2008

Qingzhou Keda Mining Machine co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Gold Dry Blower Gold Mining Equipment with 1-3t/h Processing Capacity ISO 9001:2008

Place of Origin : Shandong china

Brand Name : Keda

Packaging Details : LCL or as required.
Keda Supply Alluvial Gold Dry Blower, Gold Mining Equipment Price

Price : $1,080/sets >=1 sets

Certification : CE 9001

MOQ : 1

Type : Gravity Separator

Production Capacity : >90%

Voltage : 220/380v

Dimension(L*W*H) : 1350*550*1500 mm

Weight : 30 KG

Warranty : 1 Year

Machinery Test Report : Provided

Video outgoing-inspection : Provided

Core Components : Pump, Engine

Key Selling Points : Patented Product

Processing Capacity : 1-3t/h

Material : Stainless Steel

Color : Customized

Noise : <85dB(A)

Pipe Material : PVC tube

After sale service : One Year

Installation : Engineer Guide

Quality : ISO 90012008 Standard

Applicable Industries : Manufacturing Plant, Energy & Mining

Showroom Location : None

Condition : New

Marketing Type : Hot Product 2019

Warranty of core components : 1 Year

Port : Qingdao

Contact Now

Keda Supply Alluvial Gold Dry Blower Gold Mining Equipment Price

Product Description

Features

  • It works by wind power and is widely used in non-water and desert area.
  • Easy to operate. 1-2 persons are needed. Save labor force.
  • Less fuel consumption and save cost.
  • It is portable, convenient to transport and assemble.

Basic Parameter

Model KD-1.3D KD-2.6D KD-4.8D
Dimension(mm) 1350*550*1500 1800*750*1600 2400*750*1600
Power Centrifugal blower Centrifugal blower Centrifugal blower
Centrifugal blower model KD-1.5 KD-3 KD-5.5
Noise <85dB(A) <87dB(A) <89dB(A)
Weight(Kg) 30/32.2 48 79
Blower capacity 2000m³/h 4120m³/h 5847m³/h
Pipe material PVC tube PVC tube PVC tube
Box material stainless steel stainless steel stainless steel
Working capacity 1-3t/h 2-6t/h 4-8t/h

Customers' Visiting

Our Services

  1. Customers' mining project consult will be provided by our experienced engineers and technicist.
  2. According to customers' request the testing sample in laboratory will be available all the time.
  3. We always providing whole production line equipments and spare parts with the best price.
  4. We will dispatch engineer overseas to guide for equipment installation and debugging if needed.
  5. We will train customers' local first batch workers and make them operate expertly if needed.
  6. We will help solve the problems on the equipment operation by electronic tools or to the site.

Company Information

Gold Dry Blower Gold Mining Equipment with 1-3t/h Processing Capacity ISO 9001:2008

Qingzhou Keda Mining Machine Co., Ltd. locates in Qingzhou City, Shandong Province, China.

  1. We are a modern large-scale mineral processing equipment manufacturer devoting ourselves to fields of gold mining, sand pumping and desilting with long time exploring and R&D experience.
  2. All our products have been certified by ISO9001 and many of them have been exported to more than fifty countries and regions such as Fiji, Ghana, Mali, Colombia, Nigeria, Sierra Leone, Papua New Guinea, Bangladesh, Sultan, Korea, USA, Russia, India and so on.

Certificate

Recent Win-win Cases

FAQ

  1. Is our company a direct or indirect producer?— Our company is a direct producer.
  2. What's the main product of our company? — Our main product is gold extracting equipment.
  3. Are our products certified or patented? — Yes, we only provide certified products.
  4. Can we offer good after sale service? — Yes, the warranty of all our products is one year and all spare parts will be provided fast and cheap forever.

You are invited to create a bright future with us. Please contact!


Product Tags:

3t/h Gold Dry Blower

      

1t/h Gold Mining Equipment

      

ISO 9001:2008 Gravity Separator

      
Wholesale Gold Dry Blower Gold Mining Equipment with 1-3t/h Processing Capacity ISO 9001:2008 from china suppliers

Gold Dry Blower Gold Mining Equipment with 1-3t/h Processing Capacity ISO 9001:2008 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingzhou Keda Mining Machine co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)